An exam blueprint that changed last month makes last year's notes dangerous. That is why GetValidTest refreshes its FlashArray-Implementation-Specialist practice questions continuously, and why every Pure Storage Certified FlashArray Implementation Specialist order in 2026 includes 365 days of free updates delivered straight to you.
Pure Storage FlashArray-Implementation-Specialist Exam Overview:
| Certification Vendor: | Pure Storage |
|---|---|
| Exam Name: | Pure Storage Certified FlashArray Implementation Specialist |
| Exam Number: | FAIS |
| Available Languages: | English |
| Exam Format: | Multiple Choice (three or four options, one to two correct answers) |
| Exam Duration: | 120 minutes |
| Related Certifications: | Pure Storage FlashArray Implementation Specialist Certification |
| Certificate Validity Period: | 3 years |
| Real Exam Qty: | 75 |
| Exam Price: | USD $300 |
| Passing Score: | Not publicly disclosed by Pure Storage |
| Sample Questions: | ![]() |
| Exam Way: | Online (proctored via examslocal.com) |
| Pre Condition: | Recommended hands-on experience with Pure Storage FlashArray systems. Targeted at internal Pure Storage Support Specialists, Partner Support Specialists with root level access, and Enterprise or Dark Site customers with root level access. |
| Official Syllabus URL: | https://academy.purestorage.com/student/page/2164533-certification-fais |
Pure Storage FlashArray-Implementation-Specialist Exam Syllabus Topics:
| Section | Objectives |
|---|---|
| Topic 1: Upgrade | - Hardware component swaps and shelf upgrades - Controller and drive firmware upgrades - Purity upgrade procedures and version management |
| Topic 2: Post-Install/Upgrade | - Confirm FlashArray meets performance targets - Optimize configuration settings - Establish monitoring baselines - Integrate with existing storage networks - Verify system performance and validate data integrity |
| Topic 3: Pre-Install | - Document pre-flight checks to minimize downtime and risk - Prepare migration strategies - Identify compatibility requirements - Plan capacity and assess current infrastructure - Evaluate existing workloads and determine upgrade paths - Determine if best practices are met for deployment readiness - Validate site-survey data prior to installation |
| Topic 4: Install | - Hardware setup and cabling requirements - Initial configuration and system bring-up procedures - Confirm system readiness before production deployment - Validate prerequisites and connect components |
Pure Storage Certified FlashArray Implementation Specialist — Questions and Answers
The official Pure Storage Certified FlashArray Implementation Specialist blueprint is split into 4 domains, starting with Pre-Install, Post-Install/Upgrade, Install. The percentages tell you where the exam concentrates its questions, so budget your study time accordingly — the complete outline above lists every domain and subtopic.
The Pure Storage Certified FlashArray Implementation Specialist is Pure Storage's official exam for the Pure Storage FAIS certification, positioned at the Specialist level. It is the credential hiring managers scan for, and passing it proves your skills meet the vendor's own standard. It also links to related certifications like Pure Storage FlashArray Implementation Specialist Certification, so this exam can serve as a building block in a longer certification plan.
The official registration fee is USD $300, and you will need Not publicly disclosed by Pure Storage to pass. Here is the part people forget: fail, and the retake costs the same full fee again — there is no discount for a second attempt. Drill with the 236 practice questions from GetValidTest until your scores are consistently past the mark, and only then spend that fee.
Yes — a free PDF demo lets you inspect the question quality and format before you pay a cent. Once you purchase, your Pure Storage Certified FlashArray Implementation Specialist material comes with 365 days of free updates, and if that update period ever lapses, extending it costs just 50% of the price in your member zone.
The exam contains 75 questions to be finished within 120 minutes. That ratio is tighter than most candidates expect, which is why pacing matters as much as knowledge. Practice skipping and returning to hard questions, set yourself a per-question time budget, and complete at least two full timed mock exams in the GetValidTest engine so you feel the clock pressure before it actually counts.
Recommended hands-on experience with Pure Storage FlashArray systems. Targeted at internal Pure Storage Support Specialists, Partner Support Specialists with root level access, and Enterprise or Dark Site customers with root level access. Vendor requirements do change from time to time, so confirm the current criteria before scheduling — the official FlashArray-Implementation-Specialist exam page has the final word.
Two promises, both in writing. First, delivery: your files unlock for instant download the moment payment clears, a copy hits your mailbox within a minute, and you can install the material on unlimited computers — if 2 hours pass without anything arriving, contact our 24/7 support team. Second, the 100% Money Back Guarantee: take the corresponding FlashArray-Implementation-Specialist exam within 60 days of purchase, and if you don't pass, submit a scanned enrollment slip plus the official Score Report PDF within 2 days of the exam for a full refund, processed within 7 days. Conditions apply — exams taken within 3 days of purchase don't qualify, the candidate name must match the payer's, and free materials or expired orders are excluded. Rather keep studying? Exchange your order for two other exam products of equal value, free of charge, while your original updates continue.
Pure Storage Certified FlashArray Implementation Specialist Sample Questions:
Prior to running the puresetup newarray command, which command should an Installation Engineer run on a new install of an //XR4 array?
- A. pureboot list
- B. purehw list
- C. cobalt_check.py
Correct Answer: C 🗳️
Explanation: Only visible for GetValidTest members. You can sign-up / login (it's free).
An Implementation Engineer is performing an inventory for an NDU from a FlashArray//X70R2 to a FlashArray//X70R4 and discovers that a complete FlashArray//X70R4 was shipped instead of an NDU kit.
What is the minimum hardware the Implementation Engineer should use from the new array to complete the NDU?
- A. Controllers and power supplies
- B. Controllers and NVRAM
- C. Controllers
Correct Answer: C 🗳️
Explanation: Only visible for GetValidTest members. You can sign-up / login (it's free).
An Implementation Engineer is installing the first DirectFlash Shelf (DFS) on a FlashArray//XR4 controller.
Which ports should the Implementation Engineer use for the connection?
- A. ETH 0/1
- B. ETH 10/11
- C. ETH 18/19
Correct Answer: C 🗳️
Explanation: Only visible for GetValidTest members. You can sign-up / login (it's free).
During a hardware NDU from a FlashArray//X20R3 to an X20R4-LL (low-line) model, the Implementation Engineer encounters a failure during the power supply check. Voltage readings are correct. What is a likely cause of this failure?
- A. The power cables are NOT fully seated in the array.
- B. There are more than 10 drives installed in the chassis.
- C. Purity does NOT recognize the power supplies installed in the array.
Correct Answer: B 🗳️
Explanation: Only visible for GetValidTest members. You can sign-up / login (it's free).
After upgrading Purity during a new installation, which command should an Implementation Engineer run to determine what version of Purity will be loaded at the next boot of the FlashArray?
- A. pureboot list
- B. purearray list --controller
- C. pureversion -a
Correct Answer: A 🗳️
Explanation: Only visible for GetValidTest members. You can sign-up / login (it's free).
Viewing page 1 out of 48 pages.
Viewing questions 1-5 out of 236 questions.



